Client
Completion period
Construction cost
The intervention concerned the reinforcement of the foundations of the bound buildings facing the Marani canal. The areas facing the foundations were dried, then a conservative restoration was carried out towards the side of the canal and injections were made on the internal side of the same. All the facades of the protected buildings facing the Marani canal were subsequently restored, the roof trusses recovered from a previously carried out demolition were then secured and the construction site barracks prepared for the new construction activities